Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 60: 1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR
Project Number:
Title:
Umatilla Anadromous Fish Habitat-Umatilla Tribe
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Umatilla 100.00%
Contract Number:
73982 REL 60
Contract Title:
1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR
Contract Continuation:
Previous: Next:
73982 REL 33: 1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR
  • 73982 REL 96: 1987-100-01 EXP UMATILLA ANADROMOUS FISH HABITAT - CTUIR
Contract Status:
Closed
Contract Description:
During CY2019, the project will continue to work on coordination efforts, identification of new projects, planning and permitting, designs and construction. Permitting and designs will continue for the East Birch Floodplain Reconnection, Brown's Dairy Dam Removal and UmaBirch Floodplain Reconnection Projects. Designs will begin for the UmaBirch Project. Major construction projects will occur on the Brown's Dairy Dam and Meacham Creek - Bonifer Reach (Project Area 2). The Bonifer Reach Project is a continuation of the previous contract, which completed Project Areas 3 and 4. Crews will also continue to maintain high priority project areas, treat weeds and complete all planting necessary within all project areas.
Account Type(s):
Expense
Contract Start Date:
02/01/2019
Contract End Date:
01/31/2020
Current Contract Value:
$1,858,149
Expenditures:
$1,858,149

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Julie Burke Umatilla Confederated Tribes (CTUIR) Yes Administrative Contact julieburke@ctuir.org (541) 429-7292
Richard Christian Umatilla Confederated Tribes (CTUIR) Yes Contract Manager richardchristian@ctuir.org (541) 429-7283
Lisa Dexter Bonneville Power Administration Yes Contracting Officer lldexter@bpa.gov (503) 230-3893
Hannah Dondy-Kaplan Bonneville Power Administration Yes Interested Party hadondy-kaplan@bpa.gov (503) 230-4071
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Katey Grange Bonneville Power Administration Yes Interested Party kcgrange@bpa.gov (503) 230-4047
Ethan Green Umatilla Confederated Tribes (CTUIR) Yes Technical Contact ethangreen@ctuir.org (541) 429-7555
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Gary James Umatilla Confederated Tribes (CTUIR) No Supervisor garyjames@ctuir.org (541) 429-7285
Mikayla Kelly Umatilla Confederated Tribes (CTUIR) Yes Technical Contact mikaylakelly@ctuir.org (541) 429-7263
Michael Lambert Umatilla Confederated Tribes (CTUIR) Yes Supervisor mikelambert@ctuir.org (541) 429-7240
Andre L'Heureux Bonneville Power Administration Yes F&W Approver allheureux@bpa.gov (503) 230-4482
Timothy Ludington Bonneville Power Administration Yes COR tsludington@bpa.gov (503) 230-4988
Scott O'Daniel Umatilla Confederated Tribes (CTUIR) Yes Technical Contact scottodaniel@ctuir.org (541) 429-7452
Christopher Roper Bonneville Power Administration No Interested Party cproper@bpa.gov (503) 230-3514


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Upload SOW, budget, property inventory for upcoming contract period to Pisces. A: 119. Manage and Administer Project 01/31/2020 01/31/2020
Receipt of environmental compliance clearance on project work elements from BPA C: 165. Produce Environmental Compliance Documentation 01/31/2020 01/31/2020
Completed Annual Report D: 132. Produce Annual Progress Report CY 18 (Jan. 1, 2018 thru Dec. 31, 2018) 01/31/2020
List of final projects E: 114. CTUIR Umatilla Subbasin Restoration Coordination 01/31/2020 01/31/2020
Coordinate watershed association activities F: 191. Umatilla River Watershed coordination duties 01/31/2020 01/31/2020
Complete outreach and education activities G: 99. Public Outreach and Education 01/31/2020 01/31/2020
Provide technical input and summaries to enhance or protect natural resources in the subbasin. H: 122. Review and provide technical input on issues and topics that affect the area's natural resources 01/31/2020 01/31/2020
Maintain proper operation of instream habitat structures I: 186. Inspect and maintain function of instream improvement structures 01/31/2020 01/31/2020
Maintenance of habitat features associated with project conservation agreements J: 186. Maintenance of habitat features associated with project conservation agreements 01/31/2020 12/30/2019
Maximize survival of native vegetation in enhancement project areas. K: 198. Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas 01/31/2020 12/30/2019
Wildhorse Creek - Athena Bridge Replacement and Channel Construction L: 184. Wildhorse Creek - Athena Fish Passage Project Implementation 01/31/2020 12/31/2019
Draft Umatilla River Subbasin Assessment and Action Plan M: 115. Produce Umatilla River Subbasin Assessment 01/31/2020
Produce documents and surveys necessary for the conservation easement N: 172. Conduct pre-aquisition activities for Birch Creek-Umatilla River confluence, UmaBirch LLC Properties 01/31/2020
UmaBirch Reith Dam Removal Design and Permits O: 175. Reith Dam Removal Design and Permits 10/31/2019 07/15/2019
Brown's Dairy Dam removed P: 84. Reith Dam Removal Implementation 01/30/2020 08/30/2019
60% UmaBirch Floodplain Restoration and Habitat Enhancement Design Q: 175. UmaBirch Properties - Floodplain Restoration and Habitat Enhancement Draft Designs 01/31/2020
Create Floodplain Complexity R: 29. Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 2 01/31/2020 09/09/2019
Completed channel construction S: 30. Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 2 01/31/2020 09/09/2019
Complete scheduled tree and shrub plantings in project areas T: 47. Meacham Creek Floodplain Restoration and In-stream Enhancement, RM 3.2 - 6.1 Planting 01/31/2020 12/31/2019
East Birch Creek RM 5.3 - 5.8 Habitat Enhancement Design U: 175. East Birch Creek RM 5.3 - 5.8 Habitat Enhancement Project Design 01/31/2020
Create Floodplain Complexity V: 29. Construction - East Birch Creek Floodplain Reconnection Project 01/31/2020
Completed channel construction W: 30. Construction - East Birch Creek Floodplain Reconnection 01/31/2020
Install beaver dam support complexes X: 29. Install Wildhorse Creek Beaver Dam Support Structures 01/31/2020 01/31/2020
Data Acquisition Y: 115. New CCR 43149 Upper Umatilla River LiDAR Acquisition 01/31/2020 01/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
Sockeye (O. nerka) - Other
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 3 instances of WE 175 Produce Design
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 115 Produce Inventory or Assessment
  • 2 instances of WE 175 Produce Design
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and Administer Project 02/01/2019
B 185 Periodic Status Reports for BPA 02/01/2019
C 165 Produce Environmental Compliance Documentation 02/01/2019
D 132 Produce Annual Progress Report CY 18 (Jan. 1, 2018 thru Dec. 31, 2018) 02/01/2019
E 114 CTUIR Umatilla Subbasin Restoration Coordination 02/01/2019
F 191 Umatilla River Watershed coordination duties 02/01/2019
G 99 Public Outreach and Education 02/01/2019
H 122 Review and provide technical input on issues and topics that affect the area's natural resources 02/01/2019
I 186 Inspect and maintain function of instream improvement structures 10/29/2018
J 186 Maintenance of habitat features associated with project conservation agreements 04/10/2019
K 198 Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas 04/10/2019
L 184 Wildhorse Creek - Athena Fish Passage Project Implementation 04/10/2019
M 115 Produce Umatilla River Subbasin Assessment 02/01/2019
N 172 Conduct pre-aquisition activities for Birch Creek-Umatilla River confluence, UmaBirch LLC Properties 02/01/2019
O 175 Reith Dam Removal Design and Permits 10/29/2018
P 84 Reith Dam Removal Implementation 06/17/2019
Q 175 UmaBirch Properties - Floodplain Restoration and Habitat Enhancement Draft Designs 10/29/2018
R 29 Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 2 04/10/2019
S 30 Construction - Bonifer Floodplain Restoration and In-stream Enhancement- PA 2 04/10/2019
T 47 Meacham Creek Floodplain Restoration and In-stream Enhancement, RM 3.2 - 6.1 Planting 02/01/2019
U 175 East Birch Creek RM 5.3 - 5.8 Habitat Enhancement Project Design 02/01/2019
V 29 Construction - East Birch Creek Floodplain Reconnection Project
W 30 Construction - East Birch Creek Floodplain Reconnection
X 29 Install Wildhorse Creek Beaver Dam Support Structures 04/10/2019
Y 115 New CCR 43149 Upper Umatilla River LiDAR Acquisition 09/30/2019